ready Vision House · Rev 358 items · 48 trusted · 6 need decision · 4 deferred
Resolved 52 / 58

Takeoff

Vision House · Rev 3

Quantities with trust bands. Click any row for "why this number".

View progress
Item Qty Unit Source sheet Plan · Schedule · Our count Trust Decision
Doors — D1 (single leaf) 12 nr A-101, A-103, A-104 12 · 14 · 12 Trusted resolved → schedule 14
Windows — W2 (1200×1500) 8 nr A-101 8 · 8 · 8 Trusted autodetected
Concrete — slab (C30) 74.6 A-201, S-101 74.6 · · 74.6 Trusted measured
Studs — 50×100 @ 600 c/c 236 m A-201 236 · — · 236 Trusted measured
Outlets — double (medium) 22 nr A-401, E-101 22 · · 22 Trusted autodetected
Doors — D2 (double leaf) 4 nr A-101, A-103 2 · 4 · 3 Must-review needs your decision ↓
Brick — facing (single skin) 62.4 A-301 62 · 70 · 62.4 Must-review needs your decision ↓
Skylights — SK3 (Velux) 3 nr A-501 3 · 3 · 3 Verify single source — please cross-check
Cabinets — base (kitchen) 4.8 m A-601 4.8 · 4.6 · 4.8 Verify close but plan ≠ schedule
Steel beams — UB 305×165 kg S-201 — · — · — Unverifiable needs your call
Floor finishes — tile (500×500) — · — · — Deferred skipped — re-cad later

No takeoff yet — drop the drawings to get started

The first time you open the workspace, the table is empty. Drop your drawings in; we'll come back when we've read them

Open drawings →